Supply Chain
Tender Bidding
The other side of a tender: one deadline board across every buyer that invited you, a costing sheet sealed under your own passphrase that the buyer cannot read, a pre-flight that refuses a bid which would be thrown out, and a receipt proving what you sent and when
Capabilities
- The other side of a tender: one deadline board across every buyer that invited you
- a costing sheet sealed under your own passphrase that the buyer cannot read
- a pre-flight that refuses a bid which would be thrown out
- and a receipt proving what you sent
- when
What it does
The work Tender Bidding takes off your desk on an ordinary day.
01
One board for every buyer
Bidders do not work for one client. A single board carries every live tender across every buying entity you hold a portal on, closing soonest first, with the server's own countdown on each — not your browser's — and what is still missing from each bid beside it. If one buyer's system is having a bad afternoon, that buyer is named and the other eight still show, because three of them might close tomorrow.
02
The certificate that loses the tender
A bid is rejected for an ISO certificate that expired three weeks before the award, and everybody involved knew enough to prevent it. Upload each document once, with its expiry date, attach it to any bid in two clicks — and be warned when it dies before that bid's validity period runs out, not when it has already been read out in the room. Retired, never deleted: a certificate attached to a bid you submitted last year has to still be readable when that bid is being argued about.
03
A pre-flight that says no
Refusing to send an incomplete bid is the feature, not an inconvenience. Every mandatory document present, every amendment acknowledged, every bill line priced, every requirement answered, the bond long enough, the classification high enough, the declaration accepted — each failure named as a specific thing to go and fix. The same check runs again on the server when you press send, so the screen cannot be talked round and neither can the person using it.
04
Late is recorded, not refused
If your bid arrives one second past the hour it is recorded as late — by exactly how many seconds, on the server's clock, with a receipt. It will not be opened and it will not be evaluated, and it will not be quietly dropped either. A bidder who tried needs the evidence as much as the buying entity does, and "we submitted on time" deserves an answer that is a record rather than an opinion.
05
Bid or no bid, before the effort
Most lost tenders were lost by bidding for the wrong thing. Six scores out of ten — can we do it, are the people free, is there margin in it, what could go wrong, do we know this buyer, who else will bid — and the reasoning written down while it is still true. The decline is recorded with its reason, which is the most useful thing your own office has when the same buyer asks again in September.
06
One response, two compliance matrices
The buying entity's specification arrives as a checklist: complies, deviation, exception, not offered — with the deviation described in your own words. That becomes their compliance matrix without anybody retyping it from a PDF, which is the single biggest time saving on both sides of a tender. Your responses stay on your side of the wall until the envelope is opened: a technical answer the buyer could read before the ceremony would break the seal as surely as a price would.
Installs with
These apps are installed automatically because Tender Bidding builds on them.
Included in these industries
Available as an add-on to any industry model.
More in Supply Chain
- InventoryWave 1Warehouses, stock, transfers, counts, serials and lots, expiry, valuation, reorder and labels
- PurchaseWave 1RFQs, supplier quotes with drop-import, purchase option comparison, POs, receiving, bills and supplier ledger
- DeliveryWave 1Delivery notes, dispatch board, drivers, proof of delivery and route sheets
- ManufacturingWave 3BOMs, work orders, routings, work centres, MRP, scrap and subcontracting
- Tenders and AuctionsWave 3A competition with rules, for buying and for selling: sealed bids no one can open early, a deadline nobody can move, an opening in front of witnesses, scored evaluation, and an award that can be explained line by line — with the public-notice periods, the standstill and the published result a government entity is held to
- PLMWave 5Engineering change orders, BOM versions and approvals
Start with Tender Bidding, free.
One app is free forever with unlimited users. Add more when you are ready.